Monday, December 16, 2013

16 December. Mick playing pavers and fixing stuff

Mick playing pavers and fixing stuff

The last paver is in...




Mick has sealed the external door with aluminium strips...





Friday, December 13, 2013

13 December. Mick laying pavers

12 December. Mick laying pavers.
We'll use 1/4 minus around the edges of the pavers. It looks good so far.



Wednesday, December 11, 2013

Monday, December 9, 2013

Monday, December 2, 2013

Thursday, November 28, 2013

28 November - Plumber Dillon fixed powder room toilet

Plumber Dillon fixed powder room toilet - 1500

At last we have the right buttons for the powder room toilet.



Monday, November 25, 2013

25 November. Last load of stuff from storage moved in. Plumber came.

Last load of stuff from storage moved in.

Laura has cleaned up and put all the kitchen stuff away, and the place looks almost like a home again.

Total cost for the van from Rent-a-bomb was $250.

Plumber Chris came to fix powder room toilet buttons, but still has the wrong buttons. Back to Reece.




Saturday, November 23, 2013

Friday, November 22, 2013

22 November. Hire van and move stuff. Mick fixing flue

Hire van and move stuff

Mick came to fix the flue for the range hood.
He has also bogged up the hole where the sewer pipe goes into the powder room.





Thursday, November 21, 2013

21 November. Hire van and move stuff. Blind Freddy came for quote - Paul

Paul from Blind Freddy came to give quote for blinds and shutters - 1100

Hire a High Ace from Rent-a-bomb, 0930. I have the first van full from storage.

Picked up flue kit from Johnny in Brunswick.







Tuesday, November 19, 2013

Monday, November 18, 2013