Showing posts with label problems. Show all posts
Showing posts with label problems. Show all posts

Saturday, May 24, 2014

24 May - acid wash done, looking good now.

24 May - Hamish and Marcus have acid wash done, looking good now.







Almost dry, and looking better...





Monday, May 19, 2014

19 May - phone calls

Soc' called from Neocheck - should have Cert tomorrow

Marcus called - will acid wash paves on Friday early


Friday, May 16, 2014

16 May. Day after bluestone pavers - needs an acid wash. Called Neocheck again

Needs an acid wash maybe ? I have let Marcus know. They finished the job in a rush and in the dark.

I have called Neocheck yet again to chase final certificate. Inspection was 28 Feb. Sigh...




Tuesday, April 29, 2014

29 April. Mick 0700. Inner City Floorworld - David

Mick 0700  - fix big crack in the plaster at the top of the stairs - half day - and these cracks here - plus squeaky step.

Inner City Floorworld. David Lithgow. 1700. Will send quote



Monday, April 28, 2014

28 April.Mick 0700 - fix crack in the plaster

Mick 0700  - fix big crack in the plaster at the top of the stairs
called NeoCheck again to chase up Certificate



Thursday, November 28, 2013

28 November - Plumber Dillon fixed powder room toilet

Plumber Dillon fixed powder room toilet - 1500

At last we have the right buttons for the powder room toilet.



Monday, November 25, 2013

25 November. Last load of stuff from storage moved in. Plumber came.

Last load of stuff from storage moved in.

Laura has cleaned up and put all the kitchen stuff away, and the place looks almost like a home again.

Total cost for the van from Rent-a-bomb was $250.

Plumber Chris came to fix powder room toilet buttons, but still has the wrong buttons. Back to Reece.




Thursday, November 14, 2013

14 November. Plumber to fit kitchen

14 November.  Plumber to fit kitchen, moved forward a day.

I broke a knob on the cook top when fitting the range hood, sigh... Fixed with glue for now.


 Fitting cook top ...


Gas regulator goes here. Mick had to cut a bit out of a drawer to make it fit. Thanks Mick.


Stove wired like this.


Stove wiring, for info.


Kitchen tap fitted.



Powder room sink done, but bottle trap too big.


Powder room toilet, but missing a plate from button kit.


Laundry done, but missing tie downs for sink. Sigh.




Need tie down for abbey sink, approx 300 mm across, and E-45 ?



Leaking from where ?


Wednesday, November 13, 2013

13 November. Mick dropped around to fix range hood.

Mick dropped by with Sam. 

We have fixed the range hood that would only fit back to front.

Right way around now... Thanks Mick.


Hello Sam...



Wednesday, October 30, 2013

30 October. Render finished. Kitchen panels going on

Mick 0730 to supervise.

George at 0730 to finish render.
Grand Kitchens at 0900 to fit panels
Emailed Clad for splash backs, Allpoints for kitchen fit, CST Plumbing for kitchen fit.





Whoops, island bench stone has been cut too small. We take it off and Marble Centre will cut a new one.


Looks nice...


Lovely job.


There goes the stone



But the rest looks beautiful.