Showing posts with label CST Plumbing. Show all posts
Showing posts with label CST Plumbing. Show all posts

Thursday, November 28, 2013

28 November - Plumber Dillon fixed powder room toilet

Plumber Dillon fixed powder room toilet - 1500

At last we have the right buttons for the powder room toilet.



Monday, November 25, 2013

25 November. Last load of stuff from storage moved in. Plumber came.

Last load of stuff from storage moved in.

Laura has cleaned up and put all the kitchen stuff away, and the place looks almost like a home again.

Total cost for the van from Rent-a-bomb was $250.

Plumber Chris came to fix powder room toilet buttons, but still has the wrong buttons. Back to Reece.




Thursday, November 14, 2013

14 November. Plumber to fit kitchen

14 November.  Plumber to fit kitchen, moved forward a day.

I broke a knob on the cook top when fitting the range hood, sigh... Fixed with glue for now.


 Fitting cook top ...


Gas regulator goes here. Mick had to cut a bit out of a drawer to make it fit. Thanks Mick.


Stove wired like this.


Stove wiring, for info.


Kitchen tap fitted.



Powder room sink done, but bottle trap too big.


Powder room toilet, but missing a plate from button kit.


Laundry done, but missing tie downs for sink. Sigh.




Need tie down for abbey sink, approx 300 mm across, and E-45 ?



Leaking from where ?


Wednesday, September 11, 2013

11 Sep. Plumbers here, and Mick to supervise.

 Plumbers here, and Mick to supervise.

Shower gully trap fixed - was a broken thread.
Down-pipe on shed fixed.

Gutters and down-pipes all done...



Roof finished ...



Mick brought Sam along to watch ...




All done. Thank you Chris and Dillon and Serkan.

Thursday, September 5, 2013

Thursday, August 29, 2013

29 Aug. Hot water ! Roof flashing going on at last. Exciting day.

Onsite Chris, Dillon, Serkan doing roof and hot water. Hooraaa.
Hot water now on. Fireplace works.
Roof not finished as they need to order more flashing.

Onsite Mick and Alf 0700 skirts




Look at that ! Hot water !





Wednesday, August 28, 2013

28 Aug. Mick fixing roof ready for flashing

Onsite -  Mick fixing roof ready for flashing 0700

Chris the plumber rang to say flashing will be delivered today. They will  be here tomorrow.

Put the cornices on Gumtree...


Mick painting...


Fixing the roof...





Thursday, June 20, 2013

20 June. Painting. Plumber fitting bathroom and fixing cut sewer pipe.

.onsite Mick, Alf only. Painting today.
CST Plumbing Chris and Dillon fitting bathroom and fixing cut sewer pipe.

Back bedroom looking good now.






Dillon has repaired our sewer pipe.





Dillon has laid pipe for new powder room toilet



Woohoo. We have a bath and a shower now - just no hot water yet



Dinner with Johnny H at Victoria St, Richmond. He dropped around to see the progress.