Onsite Mick John Alf - painting, plaster kitchen
Friday, June 28, 2013
Thursday, June 27, 2013
27 June. Mick, John, Alf - painting, plaster kitchen
Onsite Mick John Alf - painting, plaster kitchen
Met this lovely lass at Cavallini.
More plaster in kitchen. Mick painting upstairs - almost done. Sand and polish floors next.
Met this lovely lass at Cavallini.
More plaster in kitchen. Mick painting upstairs - almost done. Sand and polish floors next.
Wednesday, June 26, 2013
26 June. Clas shower screen. Plaster. Paint
Onsite Mick John Alf - painting, plaster kitchen
Clas Shower install 1130. Jeff.
Nice job. Looks good. May have to caulk a little more when caulker comes back.
Clas Shower install 1130. Jeff.
Nice job. Looks good. May have to caulk a little more when caulker comes back.
Tuesday, June 25, 2013
25 June. Allpoints Jordan Jimmy chase cables, motor cables. Mick, John, Alf - painting, plaster kitchen
Onsite Allpoints Jordan Jimmy chase cables, motor cables
Onsite Mick, John, Alf - painting, plaster kitchen
We went to Masters and Lock and Handle on High St - for door stops, door handles, window latches and window lifters. Bought 5 of their own design Round Lever Carmichael CP @ $25 each.
Emailed HH again to fit all panels upstairs.
Went to Lights Lights Lights and Lamp City on Ascot Vale - and parking fine too. Sigh.
Onsite Mick, John, Alf - painting, plaster kitchen
We went to Masters and Lock and Handle on High St - for door stops, door handles, window latches and window lifters. Bought 5 of their own design Round Lever Carmichael CP @ $25 each.
Emailed HH again to fit all panels upstairs.
Went to Lights Lights Lights and Lamp City on Ascot Vale - and parking fine too. Sigh.
Monday, June 24, 2013
24 June. First window. Kick boards. Painting. ** Toilet jammed
Onsite. Mick, Alf, John.
** Problem with toilet upstairs running. Float jammed.
Regency delivered first window 0900.
emailed HH to fit panels in Bed1 and Bed2. No point doing towel rails yet.
** Problem with toilet upstairs running. Float jammed.
Regency delivered first window 0900.
emailed HH to fit panels in Bed1 and Bed2. No point doing towel rails yet.
Sunday, June 23, 2013
Saturday, June 22, 2013
Friday, June 21, 2013
Thursday, June 20, 2013
20 June. Painting. Plumber fitting bathroom and fixing cut sewer pipe.
.onsite Mick, Alf only. Painting today.
CST Plumbing Chris and Dillon fitting bathroom and fixing cut sewer pipe.
Back bedroom looking good now.
Dillon has repaired our sewer pipe.
Woohoo. We have a bath and a shower now - just no hot water yet
Dinner with Johnny H at Victoria St, Richmond. He dropped around to see the progress.
CST Plumbing Chris and Dillon fitting bathroom and fixing cut sewer pipe.
Back bedroom looking good now.
Dillon has repaired our sewer pipe.
Dillon has laid pipe for new powder room toilet
Woohoo. We have a bath and a shower now - just no hot water yet
Dinner with Johnny H at Victoria St, Richmond. He dropped around to see the progress.