Friday, November 29, 2013

29 November. HH have fitted the problem towel rail

HH have fitted the problem towel rail - 0730


Thursday, November 28, 2013

28 November - Plumber Dillon fixed powder room toilet

Plumber Dillon fixed powder room toilet - 1500

At last we have the right buttons for the powder room toilet.



Monday, November 25, 2013

25 November. Last load of stuff from storage moved in. Plumber came.

Last load of stuff from storage moved in.

Laura has cleaned up and put all the kitchen stuff away, and the place looks almost like a home again.

Total cost for the van from Rent-a-bomb was $250.

Plumber Chris came to fix powder room toilet buttons, but still has the wrong buttons. Back to Reece.




Saturday, November 23, 2013

Friday, November 22, 2013

22 November. Hire van and move stuff. Mick fixing flue

Hire van and move stuff

Mick came to fix the flue for the range hood.
He has also bogged up the hole where the sewer pipe goes into the powder room.





Thursday, November 21, 2013

21 November. Hire van and move stuff. Blind Freddy came for quote - Paul

Paul from Blind Freddy came to give quote for blinds and shutters - 1100

Hire a High Ace from Rent-a-bomb, 0930. I have the first van full from storage.

Picked up flue kit from Johnny in Brunswick.







Tuesday, November 19, 2013

Monday, November 18, 2013

Saturday, November 16, 2013

16 November. Saturday. Paint on pipes and door handles on powder room

I've put a coat of paint on the new pipes in the light well, as well as on all the hydronic heating pipes and anything else that looked messy.

I've put new shiny hinges on the bathroom and powder room, and handles on the powder room.

Remember to buy two door stops...


Handles on powder room...






Friday, November 15, 2013

15 November. Clas for mirror and splash back. Emailed Rent-a-bomb

Emailed rent-a-bomb to hire a van for 21st to the 26th. $50 a day.
Geoff from Clas rang today, at 1540.

He will deliver splash-back at 1100 on Monday 18th, along with a mirror as per email, 1085 x 250 mm, square polished edges.


Thursday, November 14, 2013

14 November. Plumber to fit kitchen

14 November.  Plumber to fit kitchen, moved forward a day.

I broke a knob on the cook top when fitting the range hood, sigh... Fixed with glue for now.


 Fitting cook top ...


Gas regulator goes here. Mick had to cut a bit out of a drawer to make it fit. Thanks Mick.


Stove wired like this.


Stove wiring, for info.


Kitchen tap fitted.



Powder room sink done, but bottle trap too big.


Powder room toilet, but missing a plate from button kit.


Laundry done, but missing tie downs for sink. Sigh.




Need tie down for abbey sink, approx 300 mm across, and E-45 ?



Leaking from where ?


Wednesday, November 13, 2013

13 November. Mick dropped around to fix range hood.

Mick dropped by with Sam. 

We have fixed the range hood that would only fit back to front.

Right way around now... Thanks Mick.


Hello Sam...



Tuesday, November 12, 2013

12 November. Allpoints to fit kitchen and lift tin on roof

 Allpoints to fit kitchen and lift tin on roof.

Nice, looks beautiful...



Range-hood and LED STRIP


Stove...




Outside lights




Kitchen power points



That problem wire at the top of the stairs has been fixed...


Ooooh, nice Porcelume light...



Laundry light



Ahh, with a light globe...