Friday, November 29, 2013

29 November. HH have fitted the problem towel rail

HH have fitted the problem towel rail - 0730


Thursday, November 28, 2013

28 November - Plumber Dillon fixed powder room toilet

Plumber Dillon fixed powder room toilet - 1500

At last we have the right buttons for the powder room toilet.



Monday, November 25, 2013

25 November. Last load of stuff from storage moved in. Plumber came.

Last load of stuff from storage moved in.

Laura has cleaned up and put all the kitchen stuff away, and the place looks almost like a home again.

Total cost for the van from Rent-a-bomb was $250.

Plumber Chris came to fix powder room toilet buttons, but still has the wrong buttons. Back to Reece.




Saturday, November 23, 2013

Friday, November 22, 2013

22 November. Hire van and move stuff. Mick fixing flue

Hire van and move stuff

Mick came to fix the flue for the range hood.
He has also bogged up the hole where the sewer pipe goes into the powder room.